

Drip irrigation system development for the Bangalore Ring Road project of the National Highway Authority of India, undertaken with Skylark Infra Engineering Pvt. Ltd.
Work commenced in 2024 and is running through 2027.
Highway-corridor greening needs irrigation infrastructure that holds up over a multi-year construction and maintenance timeline across a long, linear site.
Drip irrigation system development for green-belt planting along the ring road corridor.
Project running from 2024 through 2027.
Landscaping, irrigation, fountains, vertical gardens and nursery work from across our projects.